Skip to content
Halls and facilities
Roof installation

Hall roof - PVC membrane in Sika Sarnafil and Bauder systems

Large hall and industrial roofs covered with PVC membrane in Sika Sarnafil and Bauder systems. Fast closure of large areas, refined penetrations for equipment, warranty of up to 15 years.

Duration Depending on the building
Warranty up to 15 yrs
  • Sika Sarnafil or Bauder PVC membrane
  • Hot-air welding
  • Technical zones for equipment
Audience

Is this offer for you?

Check whether your situation matches this service.

Owners of production and storage halls General contractors of industrial buildings
Scope

What the service includes

We agree the exact scope and price after inspecting the building.

Large area

Wide membrane rolls

No open flame

Hot-air welding

Rooftop equipment

Planned penetrations and zones

Warranty

Up to 15 years, depending on the system

Included
  • Inspection and system selection
  • Thermal insulation
  • PVC membrane covering
  • Flashings and equipment penetrations
  • Roof drainage
Excluded
  • Repair or strengthening of the load-bearing structure (requires a separate design)
  • Installation of photovoltaic systems and HVAC equipment
Process

How we work

Transparent process - you know what happens at each stage.

01

Free consultation

We talk about the building, the condition of the roof and your expectations. At this stage we already point out possible solutions and what needs to be checked on site.

02

On-site inspection

We check the substrate, falls, drainage, flashings and leak points. Without this, any quote would be guesswork.

03

Quote and system selection

We prepare a paid, individual quote with a breakdown of the scope and select the covering and insulation system for the building.

04

Contract and schedule

We put the scope, schedule and warranty terms in writing - up to 15 years, depending on the chosen system.

05

Execution

We carry out the roofing works with a focus on details: flashings, service penetrations and drainage, because that is where leaks most often start.

06

Handover and aftercare

We hand over the works together with you. On request we carry out periodic inspections, and we take failure reports 24/7.

What we need from you

Roof access and coordination with the building user.

PVC membrane on large areas

PVC membrane works well on large hall roofs: it is light, laid in wide rolls and welded with hot air, without an open flame on the roof.

Systems we work with

We use membranes in Sika Sarnafil and Bauder systems, together with dedicated flashing and penetration components. The specific system depends on the building and its use.

A roof for equipment

Hall roofs often carry air-handling units, air conditioning and photovoltaics. We plan penetrations and technical zones so that servicing the equipment does not damage the covering.

Specifications

Technical standards

Hard parameters and technologies - no fluff.

Flat
ROOF TYPE
up to 15 yrs
WARRANTY
No risk

You invest safely

Custom quote, long warranty, and support right after delivery.

Warranty

up to 15 years

Warranty of up to 15 years, depending on the system used and the type of building. The terms are set out in the contract.

No commitment

0 PLN

The consultation is free and non-binding. The quote is a paid service.

Availability

When we start

Status on_request
Next step

Custom project quote

Tell us about your project - we'll prepare an individual quote tailored to your roof.

No commitment
Quick response
Tailored approach
Free consultation
Enter your name (min. 2 chars)
Enter a valid email
Phone: 9-15 digits, optional +
Message min. 10 characters
0 / 5000
Fields marked with * are required
Prefer direct contact? biuro@tectum-dachdesign.pl
Menu